Case Study
Gadsden Schools
Gadsden Schools Designs and Opens New Classrooms in Just 90 Days
Overview
The Challenge
In May of 2021, the School Board of Gadsden County needed to build six new classrooms in just 90 days, including specification, budgeting, approvals, site preparations, manufacturing, delivery, and installation. A normal timeline for a project this size would be six months from beginning to end.
The project also included tying into an existing canopy system with elevated ramps and walkways, increasing complexity and the need for planning and precision. Given the district’s high standards and commitment to first-rate educational environments, there could be no compromises on quality even with the extremely challenging timeline.
Pre-approved Classrooms and Pricing Through Florida Buy Purchasing Co-op
The Solution
Fabricon Provided a Broad Range of Services for the Project:
- (6) 100% steel, 24’x36’ non-combustible modular classrooms with restrooms
- Design and engineering for buildings, foundations, elevated walkways, and canopies
- Custom concrete access ways, precast elevated ramps, stairs, and railings
- Custom covered walkways
- Transportation, staging, blocking, leveling, anchoring, and skirting
- 3 weeks of on-site project management
Creative Solutions to Stay on Schedule
Teamwork and Collaboration
As things got down to the wire, Fabricon Modular provided extended on-site project management, round the clock installation crews, and held vendor coordination meetings with the various contractors responsible for concrete, canopies, ramps, and walkways to make sure everyone was working together in the proper sequence. Fabricon’s commitment to teamwork and collaboration made the difference, especially when extraordinary things were needed.
The Results
Less than 90 days from the first phone call, the buildings were set and leveled, the canopies, ramps, and walkways were installed, and the project was finished on-time to rave reviews. Fabricon Modular cut the normal project timeline in half, met the school board’s needs, and delivered a quality solution at a competitive price.
Final Thoughts
Teamwork and collaboration make the difference, especially when extraordinary things are needed. Fabricon Modular would never recommend banking on a 90-day project timeline, but with us in your corner, you can rest assured that we will do everything we can to take care of your needs.
~ Mark Scullion
Talk to a Team Member
For more information about Fabricon Modular’s Preconstruction & Advisory Service, reach out to our experienced team today.